Solar · storage · grid

Choose the system your site needs.

Compare operating cost, energy timing and reliability. There is no universal saving percentage or monthly-bill threshold that makes batteries right for every site.

01

Grid supply

Start with the current electricity bill and reliability requirements. Grid-only operation may be suitable when outages are infrequent and the economics do not support additional equipment.

  • What are the energy and demand charges?
  • How often do outages affect critical loads?
  • What is the cost of interruption?
02

Solar + grid

Use solar directly when generation overlaps with demand. Assess roof or land availability and the approved export arrangement. Standard grid-connected solar does not by itself guarantee power during an outage.

  • How much solar can the site use during the day?
  • How are surplus exports settled?
  • Which approvals and protection are required?
03

Solar + battery + grid

Add storage where shifting energy or supporting critical loads has measurable value. Size battery power and energy separately, then account for losses, reserve capacity and ownership costs.

  • How much energy is available for charging?
  • What backup duration is required?
  • Can energy shifting and backup reserves work together?
A fair comparison

Use the same assumptions.

Model the same load, operating days and service requirement for each option.

Include installation, maintenance, financing, export credits, storage losses and replacement. Evaluate demand-charge savings at the relevant billing interval. Do not count the same battery capacity twice for daily energy shifting and outage reserve.

Export rules vary by connection and consumer category. For example, MSEDCL publishes feasibility guidance both up to and above 10 kW; that threshold is not a blanket ban on larger net-metered systems. Check the official rooftop portal and your site's approval.

Explore industrial BESS →See an illustrative calculation