Project economics

Funding a battery storage project.

Separate equipment cost, operating savings, financing and confirmed incentives. The right funding structure depends on the applicant, site and project.

Request an itemised project proposal →
Residential rooftop solar

PM Surya Ghar

The standard assistance schedule published by the government is ₹30,000 for 1 kW, ₹60,000 for 2 kW and ₹78,000 for 3 kW or higher. Confirm the current category and eligibility before budgeting.

These figures describe residential rooftop solar assistance. Do not automatically deduct them from a battery quotation or industrial BESS cost. Consult the government announcement and official application portal. State schemes and group-housing provisions need separate assessment.

Industrial & commercial projects

Build the case from evidence.

A general claim of a fixed C&I subsidy, tax discount or payback period is not enough to finance a project.

Installed cost

Request separate prices for batteries, PCS or inverter, solar equipment, controls, protection, civil work, installation and commissioning.

Incentive eligibility

Record the scheme notification, applicant category, eligible equipment, application window and approval conditions. Include only confirmed assistance in the committed budget.

Tax treatment

Obtain a project-specific tax assessment covering classification, invoice structure, input credits and depreciation. A battery added to a solar project does not justify assuming a universal tax rate or deduction.

Financing

Compare the lender's effective interest rate, fees, collateral, tenure, repayment schedule and early-repayment terms. An indicative rate is not an approved credit offer.

Operating costs

Include charging energy, losses, maintenance, auxiliaries, insurance, degradation and replacement. Use the actual tariff and operating schedule.

Cash flow

Compare annual operating savings with debt payments and reserve contributions. Show a conservative case with no unapproved subsidy and lower-than-expected utilisation.

Compare ownership and service contracts.

An outright purchase, term loan, lease or energy-service arrangement can allocate cost and risk differently. Compare the complete payment schedule, asset ownership, performance obligations, maintenance responsibility, escalation clauses and end-of-term conditions. Availability and terms require an offer from the relevant provider.

Simple payback equals installed cost divided by annual net operating savings. A full investment assessment also considers financing, taxes, changes in savings over time and replacement costs.

Compare industrial BESS →Explore a sizing estimate