Solar panels generate energy; batteries move energy between times of day and can support selected loads during outages. The useful comparison is a site's total cost and reliability requirement, not a universal battery cost per unit.
Use the actual bill and load profile
Collect import tariffs, demand charges, time-of-day rates where applicable, export settlement terms, interval consumption and solar output. A factory with daytime demand may use much of its solar directly. A site with evening demand may benefit from storage. Neither result can be inferred from its state or monthly bill alone.
Account for losses and forgone exports
Consider a hypothetical site that charges a battery with 100 kWh of otherwise exportable solar. Assume 90% whole-system round-trip efficiency, an export credit of ₹3/kWh and a later avoided import price of ₹10/kWh. These are illustrative inputs, not quoted tariffs or TOBOR performance guarantees.
- Energy returned to the load: 100 × 90% = 90 kWh.
- Avoided import cost: 90 × ₹10 = ₹900.
- Forgone export credit: 100 × ₹3 = ₹300.
- Gross daily energy-shifting benefit: ₹600.
At 250 such operating days, the gross annual benefit is ₹1.5 lakh, before ownership costs. A different tariff, solar profile or operating schedule changes the result. Do not confuse peak PCS efficiency with whole-system round-trip efficiency.
Include the cost of owning storage
Include installed battery and solar costs, financing, maintenance, auxiliary consumption, degradation, reserve capacity and replacement. Solar has no fuel purchase during generation, but its equipment, installation and maintenance are not free. Battery throughput also has an ownership cost.
Avoid double counting
A battery held in reserve for an outage may not have the same capacity available for daily tariff shifting. Peak-demand reduction needs sufficient power and energy at the relevant billing interval. Model these uses together before adding their benefits.
For a large site, compare TOBOR industrial systems and solar, battery and grid options. Use the savings calculator as a starting estimate, then share site data for engineering review.