Delhi-NCR
By state · Delhi NCR

Industrial energy storage in Delhi NCR. Size it around your site.

Plan battery storage for facilities in Gurugram, Noida, Greater Noida and across Delhi NCR. Compare industrial systems above 250 kW for backup, solar integration and demand management.

Delhi NCR · quick facts

DISCOM

Confirm the licensee on your electricity bill

Residential tariff

Use your current tariff schedule

Commercial rate

Use your current tariff schedule

Net metering

Confirm the current arrangement with your distribution licensee.

Payback

Calculated from project cost and operating data

State-specific · Delhi-NCR

Use the approved connection terms and actual bills in your project assessment.

For facilities around Gurugram, Noida, Greater Noida, compare critical-load backup, solar self-consumption and peak-demand management using measured site data. A business category alone does not determine system size.

Gurugram
Noida
Greater Noida
Faridabad
Delhi
Application planning

Potential applications in Delhi NCR.

Illustrative facility types for project planning. These examples are not claims of completed TOBOR deployments; confirm the required configuration through a site assessment.

01

Gurugram

Cyber-city office

Site-specific sizing system · live and reporting to Tobor cloud EMS

02

Noida

Premium RWA society

Site-specific sizing system · live and reporting to Tobor cloud EMS

03

Delhi

Boutique 4-star hotel

Site-specific sizing system · live and reporting to Tobor cloud EMS

Delhi NCR · frequently asked

Local questions, answered.

How should a facility in Delhi NCR size industrial BESS?
Use interval load data, peak power, critical loads, required backup hours and the available charging window. Compare PTX systems at 500 kW, 1 MW and 2 MW and CTX systems up to 10 MW. Final sizing includes reserve capacity, conversion losses and site conditions.
Which tariff and export rules apply in Delhi NCR?
Check the current tariff order, consumer category, sanctioned load and approved connection arrangement with the distribution licensee. Do not assume one export limit or tariff applies to every site in a state.
What evidence should support the financial proposal?
Use measured electricity and diesel costs, an itemised installed price, maintenance and replacement assumptions, and confirmed financing terms. Include incentives only when the scheme and eligibility have been verified. Payback and savings are site-specific.

More answers → the full FAQ

Ready to size a system for your Delhi NCR site?

In-house BMS, EMS & PCS · Made in Gurugram