GJ
By state · Gujarat

Industrial energy storage in Gujarat. Size it around your site.

Plan battery storage for facilities in Surat, Rajkot, Ahmedabad and across Gujarat. Compare industrial systems above 250 kW for backup, solar integration and demand management.

Gujarat · quick facts

DISCOM

Confirm the licensee on your electricity bill

Residential tariff

Use your current tariff schedule

Commercial rate

Use your current tariff schedule

Net metering

Confirm the current arrangement with your distribution licensee.

Payback

Calculated from project cost and operating data

State-specific · GJ

Use the approved connection terms and actual bills in your project assessment.

For facilities around Surat, Rajkot, Ahmedabad, compare critical-load backup, solar self-consumption and peak-demand management using measured site data. A business category alone does not determine system size.

Surat
Rajkot
Ahmedabad
Vadodara
Gandhinagar
Application planning

Potential applications in Gujarat.

Illustrative facility types for project planning. These examples are not claims of completed TOBOR deployments; confirm the required configuration through a site assessment.

01

Surat

Textile dyeing unit

Site-specific sizing system · live and reporting to Tobor cloud EMS

02

Rajkot

Foundry / forging

Site-specific sizing system · live and reporting to Tobor cloud EMS

03

Ahmedabad

Apartment block

Site-specific sizing system · live and reporting to Tobor cloud EMS

Gujarat · frequently asked

Local questions, answered.

How should a facility in Gujarat size industrial BESS?
Use interval load data, peak power, critical loads, required backup hours and the available charging window. Compare PTX systems at 500 kW, 1 MW and 2 MW and CTX systems up to 10 MW. Final sizing includes reserve capacity, conversion losses and site conditions.
Which tariff and export rules apply in Gujarat?
Check the current tariff order, consumer category, sanctioned load and approved connection arrangement with the distribution licensee. Do not assume one export limit or tariff applies to every site in a state.
What evidence should support the financial proposal?
Use measured electricity and diesel costs, an itemised installed price, maintenance and replacement assumptions, and confirmed financing terms. Include incentives only when the scheme and eligibility have been verified. Payback and savings are site-specific.

More answers → the full FAQ

Ready to size a system for your Gujarat site?

In-house BMS, EMS & PCS · Made in Gurugram