Factories & industrial campuses
Size for critical loads, peak demand management and solar energy use. Include motor starting loads, outage schedules and the electrical connection in the engineering assessment.
Battery storage for factories →Industrial battery energy storage
500 kW to 10 MW
TOBOR is a BESS manufacturer and system integrator in Gurugram, India, with industrial systems above 250 kW. From factories and charging hubs to utility projects, connect battery storage, solar and intelligent controls in one engineered system.
TOBOR is a battery energy storage system (BESS) manufacturer and system integrator based in Gurugram, Haryana, India. Its industrial portfolio includes PTX systems at 500 kW, 1 MW and 2 MW, and CTX configurations up to 10 MW, with battery management, power conversion and energy management controls.
System sizing considers power, stored energy, site loads and operating requirements. Published models describe available configurations; project-specific equipment and performance are confirmed in the offer.
All systems below exceed 250 kW. Ratings come from the TOBOR product catalog; follow each model for its full technical specifications.
| Model | Rated power | Nominal energy | Application |
|---|---|---|---|
| PTX-500 → | 500 kW | 514.5 kWh | Process industry · fleet depot · commercial campus · 500 kVA DG replacement |
| PTX-1000 → | 1 MW | 1,028.9 kWh | HT industrial consumer · data-centre campus · C&I solar park |
| PTX-2000 → | 2 MW | 2,057.8 kWh | Large HT consumer · industrial park · open-access solar · DCFC hub |
| CTX-5000 → | 2.5 MW | 5.06 MWh | Energy arbitrage · peak shaving · frequency response · renewable firming |
| CTX-6600 → | 1.75 MW | 6.64 MWh | Load shifting · capacity firming · evening-peak cover · solar time-shift |
| CTX-B20 → | 10 MW | 20.26 MWh | Utility & DISCOM storage · IPP solar/wind firming · ancillary services |
Power (kW / MW) and energy (kWh / MWh) are different specifications. Nominal energy is not a guarantee of usable backup duration. Final configuration, usable capacity, protection, grid interface and operating limits are confirmed in the project offer.
Need the 250 kW entry option? See PTX-250. Smaller commercial systems remain in the full catalog.
Size for critical loads, peak demand management and solar energy use. Include motor starting loads, outage schedules and the electrical connection in the engineering assessment.
Battery storage for factories →Use battery storage to buffer charging demand where grid capacity is constrained. Charger concurrency, charging sessions and the battery recharge window determine the required system.
Explore integrated system designs →Compare CTX energy capacity and power ratings for renewable integration and scheduled dispatch. Define the grid interface, dispatch duration and project controls with the engineering team.
Explore the 10 MW CTX block →Share peak demand, interval consumption, required backup hours, solar capacity and connection voltage. We will use those inputs to scope an industrial BESS proposal.
Discuss your industrial project →