Do not treat 10 kW as a blanket Maharashtra net-metering ceiling. MSEDCL's official rooftop portal lists separate guidance for automatic feasibility approval up to 10 kW and technical feasibility studies above 10 kW. An application threshold does not establish that export is prohibited above it. Source: MSEDCL rooftop portal.
Check the arrangement for your connection
Ask the relevant distribution licensee to confirm the current rules for your consumer category, sanctioned load, proposed generation capacity, metering arrangement and network connection. Retain the applicable circular and approval with the project records. Do not use an old marketing article as evidence of export rights or restrictions.
When storage may help
Battery storage can increase solar self-consumption, move energy to another time of day or support critical loads. Its value depends on the actual load profile, import and export rates, reserve requirement and operating cost. Storage is not automatically mandatory because a solar array exceeds 10 kW.
Questions for a project proposal
- What capacity and connection arrangement has the distribution licensee approved?
- How are exports credited or settled under that arrangement?
- How much solar is directly consumed, exported or curtailed?
- What energy is available to charge the battery after daytime consumption?
- Which loads need backup, and for how long?
Compare industrial BESS above 250 kW, read how to evaluate storage economics, or request a site assessment.